General Designer:
Structural engineering:
Building engineering:
Tspc Kft.
Atlasz Mérnökiroda
Temesvári Tervező Kft.
The reinforced concrete building of the "Cube" was built in 1976 as a warehouse for the Győr Biscuit Factory, and is now transformed into a multifunctional building of the Győr University, where educational and research functions meet. A key requirement was the creation of a flexible space system in which the different functions support each other. The building has four floors of education and research spaces, and two additional floors have been occupied by large industrial companies, thus strengthening their collaboration with the university. While keeping the strict industrial facade the interior spaces are transformed and adapted to a more flexible use, still preserving the original industrial ambiance.